Planning a Pergola Step by Step: Getting Size, Orientation and Equipment Right
7 minutes read
The best way to plan a pergola is in this order: first use and dimensions, then orientation and mounting type, then permission and structure – and only at the end the equipment. That way the pergola suits your daily life, complies with the rules of your German state and carries the loads at the site. Anyone who starts with the equipment often has to re-plan later. (The permission and load rules mentioned are German; readers in the UK or elsewhere should check their local planning rules.)
The following eight steps take you from the idea to a configuration ready to order.
Step 1: Decide on the use
First ask yourself what the pergola is for:
- Dining area: table, chairs and clearance determine the minimum size.
- Lounge: sofas need more depth than chairs.
- Outdoor kitchen or barbecue: mind smoke extraction and distances; open flames under closed louvres are problematic.
- Sun protection for living rooms: then the width in front of the window wall counts above all.
- Carport or pool cover: special rules and requirements partly apply here.
Step 2: Planning a pergola – the right dimensions
As a rule of thumb: furniture area plus clearance. About one metre of space on the used sides of the table leaves room for chairs.
| Use | Furniture (example) | Recommended pergola area (guide) |
|---|---|---|
| Bistro for 2 | Table 0.80 × 0.80 m | approx. 3.00 × 2.50 m |
| Dining for 6 | Table 2.00 × 1.00 m | approx. 4.00 × 3.00 m |
| Dining for 8 | Table 2.40 × 1.00 m | approx. 4.50 × 3.50 m |
| Lounge | Corner sofa 2.50 × 2.00 m + table | approx. 4.00 × 3.50 m |
| Dining + lounge | both | from approx. 6.00 × 4.00 m |
In the AluKun configurator you choose widths from 2 to 7 m, depths from 2 to 10 m and post heights from 2 to 3.5 m. But do not plan by wish alone: the dimensions also decide permission and structural design.
Height
Height depends on three points: comfortable headroom, space above windows and doors, and distance to the roof overhang or gutter. With wall mounting, the available zone at the façade is often the limiting factor. Also think of lights or screen cassettes fitted later, which can project below the frame. In Rhineland-Palatinate the height also affects the permission question, because the enclosed volume counts there.
Tip: mark out the dimensions on site
Mark the planned post positions with stakes or tape and place table and chairs underneath as a trial. That way you quickly see whether walkways stay clear and the door opens unhindered.
Step 3: Check the orientation
| Terrace aspect | Sun | What the pergola must do |
|---|---|---|
| South | all day, high in the sky | Shading, air circulation |
| West | afternoon and evening, low | Shading plus side screen |
| East | morning | more rain protection, enjoy the morning sun |
| North | little direct sun | Rain protection, do not take additional light |
With a south or west aspect, the bioclimatic pergola plays to its strengths. How the principle works is in the basic article on the bioclimatic pergola.
Step 4: Choose the mounting type
Freestanding or with wall connection? The decision depends on the façade build-up, the available height and the position of the terrace. With wall mounting, no side elements are possible on the wall side.
- Freestanding is recommended with insulated or brick-clad façades, for terraces away from the house and when all four sides are to be closed.
- With wall connection saves posts and creates a dry transition from the house, but requires a load-bearing wall and enough height between window lintel and roof overhang.
Step 5: Clarify permission
In German building law a louvred pergola usually counts as a patio cover. The limits for developments exempt from procedure differ by state – NRW, for example, allows 30 m² of area and 4.50 m depth, Bavaria 30 m² with a depth figure of 3 m in the version available on the Bayern-Recht portal (as of September 2026). Setback areas and the development plan always apply. Check these points before you commit to dimensions. An overview is given in the article Pergola and planning permission. The development plan and the local building authority always have the final say; this article does not replace legal advice.
Step 6: Structure and site
Determine the snow load zone, wind zone and ground height of your plot. The DIBt provides assignment tables by administrative boundary. From these you learn which loads the pergola must carry. The configurator automatically adds a post as soon as the width exceeds the span limit of the system. For exposed locations or high snow loads, it is worth consulting a structural engineer. The background is explained in the article Snow load on pergolas.
Step 7: Choose the equipment
Now come the extras:
- Drive: crank or motor – with a motor, sensors and smart-home control are possible.
- Sensors: rain, wind, sun.
- Lighting: LED in the frame or in the louvres.
- Side elements: zip screens for sun and privacy protection, sliding glass walls for wind protection. One of the two per side.
- Colour: to match windows and façade, often anthracite RAL 7016.
- Additional posts: optional, for looks or to divide wide sides.
Step 8: Base, power and water
Finally, the connections:
- Foundations: pad foundations founded below frost depth, or a load-bearing concrete slab.
- Power: supply cable for motor, sensors and lighting, installed professionally by an electrician.
- Drainage: which post drains, and where does the water go?
These points should be done before installation so that the pergola can be built without delay.
Schedule: what should happen when
A made-to-measure pergola is manufactured, not delivered from stock. So plan backwards from your desired date:
- Early in the year: clarify use, dimensions and the permission question. If a building application is needed, it takes time.
- Before ordering: clarify the structural design for your site, finish the configuration and obtain a quote.
- After ordering: set foundations, prepare conduits and drainage, commission an electrician.
- At delivery: keep access and storage space free for long profiles.
- After installation: set up operation, sensors and scenarios and keep the documents.
Specific delivery and installation times depend on equipment and season; ask about them when you get the quote.
Common planning mistakes
- Dimensions by feel instead of by furniture and walkways.
- Permission limits checked only after ordering.
- Posts in front of the patio door.
- Screens on the weather side without a wind sensor.
- Drainage towards the house wall or the neighbour.
- No conduits for power in the foundation.
Checklist: planning a pergola
- Decide use and furniture.
- Determine area and height.
- Check orientation and the sun's path.
- Choose freestanding or wall connection.
- Check the state building code, setback areas and development plan.
- Determine snow and wind zone.
- Choose drive, sensors, light, side elements and colour.
- Prepare foundations, power and drainage.
Next step
With this information you can put your pergola together directly in the pergola configurator. How to use the configurator step by step is explained in the article Planning a pergola in 3D. With the finished configuration you request a quote or order directly.
Frequently asked questions
How large should a pergola be for a dining table?
Allow the table area plus roughly one metre of clearance on every side in use, so that chairs can be pushed back. For a 2.00 × 1.00 m table that quickly gives an area of about 4.00 × 3.00 m.
What height makes sense for a pergola?
The headroom under the frame should be comfortable and suit doors, windows and roof overhang. In the AluKun configurator you choose a post height between 2.00 and 3.50 m.
Which orientation is best for a louvred pergola?
South- and west-facing terraces benefit most from adjustable louvres because they heat up strongly in summer. With an east or north aspect, rain protection is more to the fore.
In what order should I plan?
First use and dimensions, then permission and structure, then equipment and base. That way you avoid a wish-list feature failing on building-law or structural limits.
Sources
- BayBO Art. 57 – Verfahrensfreie Bauvorhaben (Bayern-Recht)(opens in a new tab)
- § 62 BauO NRW 2018 – Verfahrensfreie Bauvorhaben (Gesetzestext)(opens in a new tab)
- DIBt: Technische Baubestimmungen, Schnee- und Windzonen(opens in a new tab)
- Renson: Lamellendächer – Produktinformationen und FAQ(opens in a new tab)