Replacing a Front Door: The Process, How Long It Takes and Proper Fitting

7 minutes read

Replacing a front door means: plan, apply for funding, measure precisely, order, and on fitting day remove the old door, set the new one plumb and true, fix it and seal the joints airtight inside and driving-rain-tight outside. How long it all takes depends mainly on manufacturing time and on additional work. This step-by-step overview helps you avoid the most common mistakes. The funding and legal points refer to Germany; readers elsewhere should check their own rules.

When Replacement Is Worthwhile

Typical reasons for a new front door are:

  • draughts that adjustment can no longer cure,
  • a warped or damaged leaf,
  • outdated security technology without multipoint locking,
  • poor thermal performance, for example old doors with single glazing,
  • a wish for accessibility or keyless entry,
  • an energy refurbishment in which windows and door are replaced together.

Before you replace, it is worth looking at the adjustment options on the existing door; see adjusting a front door. Many closing problems can be solved with a few simple steps.

Replacing a Front Door: The Process Step by Step

1. Planning and Selection

Decide on material, resistance class, insulation value, opening direction, glass and accessories. An overview is given in the guide to buying a front door.

2. Clarify Funding Before Placing the Order

  • BEG individual measure: BAFA supports the replacement of external doors with 15 % of eligible expenditure (as at September 2026). Conditions are the involvement of an energy efficiency expert, a door U-value of no more than 1.3 W/(m²K) and an application made before the project starts.
  • Tax bonus under § 35c EStG: an alternative to the BEG for owner-occupied homes; it likewise requires a specialist company and the technical minimum requirements.

You will find the details in the article on front door grants.

3. Survey

The specialist firm measures the opening in several places, clarifies floor heights inside and outside and determines where the new door sits in the wall. If the door is to lie in the insulation plane of existing or planned external insulation, this is taken into account here.

4. Order and Manufacture

Front doors are made to measure. The lead time depends on the manufacturer, model, colour and special features. Ask for a delivery date and only then confirm the fitting date.

5. Preparation at the House

  • Clear the route to the entrance and protect furniture and floor coverings in the hallway.
  • Have power connections prepared for motor lock, fingerprint reader or lighting.
  • Clarify how you will get into the house on fitting day and who will be there.

6. Removing the Old Door

The leaf is lifted off its hinges, the outer frame cut through and released from the reveal. Old fixings, foam residues and loose plaster are removed. This shows the condition of the masonry and the threshold.

7. Fitting the New Door

  • Insert the frame and align it plumb and true,
  • anchor it with suitable fixings in load-bearing masonry; pack behind it at the keeps and hinges,
  • set the threshold at the intended level and pack beneath it,
  • hang the leaf and adjust it.

8. Sealing the Connection Joint

The joint between frame and wall is made using the three-layer principle on which the "guideline for fitting windows and front doors" of the RAL quality association is based:

Layer Function Typical materials
Inside airtight, vapour-retarding foils, sealing tapes
Middle thermal and acoustic insulation insulating material, expanding foam
Outside driving-rain-tight, vapour-open compression tapes, foils

The principle "tighter inside than outside" prevents warm, moist room air from getting into the joint and condensing there. More in the article on airtight inside, open outside.

9. Making Good and Finishing Work

Reveals are plastered or clad with profiles, floor connections are made, hardware and handles are fitted.

10. Handover

Check with the fitter:

  • the door closes and locks smoothly at all points,
  • the seals make contact all round,
  • cylinder, motor lock, fingerprint reader and door closer work,
  • surfaces are undamaged,
  • the installation certificate, care instructions and any funding documents are provided.

What Affects the Time

A flat duration cannot be given. These factors decide:

  • Manufacturing time at the manufacturer,
  • Size of the unit: sidelights and fanlights mean more weight and work,
  • Condition of the reveal: crumbling plaster or damaged masonry costs time,
  • Changes to the opening: widening needs a new lintel,
  • Floor and threshold: adjustments to tiles, screed or external landing,
  • Electrical work for access technology,
  • Drying times of plaster.

Disposing of the Old Front Door

Clarify whether removal and disposal are included in the quote. Old doors consist of different materials such as timber, uPVC, aluminium, glass and metal hardware, which should be disposed of separately. Ask whether the firm separates the materials by type and recovers them through suitable disposal routes.

Typical Fitting Mistakes and How to Spot Them

Many complaints about new front doors go back to the fitting, not the product. Pay particular attention to these points:

  • Only foamed, not sealed: expanding foam insulates but is not an airtight or driving-rain-tight layer. Without foils or sealing tapes, draughts and moisture in the joint are a risk.
  • Threshold not packed beneath: a hollow threshold can sag under load; the door drags or closes badly.
  • Fixing only into plaster or insulation: the door must be anchored in load-bearing masonry, otherwise it loses stability and burglar resistance.
  • Frame not plumb: a skewed frame shows in uneven gap dimensions and a leaf that swings open or shut by itself.
  • Missing or blocked water drainage: water running down the leaf has to be drained outwards at the threshold. A landing sloping towards the door is a planning error.

Cost Factors of Fitting

How high the fitting costs are depends less on the door than on the situation on site: size and weight of the unit, access, condition of the reveal, adjustments to floor and external landing, electrical work, making good and disposal. Have these items shown separately in the quote so that you can compare quotes.

  • Rented flat and owners' association (WEG): the front door of a block of flats is generally common property. Replacement must be decided by the owners' association.
  • Heritage protection: for listed buildings, the heritage authority's approval is needed.
  • Change to the façade: if the opening is enlarged or the design changed significantly, check the development plan and building code. This article does not replace legal advice.
  • Legal minimum standard: in Germany, the new external door may not exceed a U-value of 1.8 W/(m²K) under Annex 7 of the Gebäudemodernisierungsgesetz.

Checklist for Replacement

  • Adjustment of the old door checked: is replacement really necessary?
  • Model, security, insulation and opening direction decided
  • Grant application made before the order is placed
  • Survey by specialist firm, position in the wall clarified
  • Delivery and fitting dates agreed, electrical work organised
  • Sealing to the three-layer principle agreed
  • Disposal of the old door included in the quote
  • Handover protocol and documents for funding received

You put together your new front door in the configurator. Trade businesses that fit doors regularly can reach us via the contact page.

Frequently asked questions

How long does it take to replace a front door?

That depends mainly on lead time and scope. The fitting appointment itself is usually short for a simple door without major building work; units with sidelights, altered openings or plastering and tiling work extend it. Your specialist firm should state the schedule beforehand.

Does the wall have to be chopped out when replacing a front door?

When the old frame is removed it is cut out, and damage to the plaster on the reveal can seldom be avoided entirely. Major chasing and cutting is needed only if the opening is altered or the door is fitted at a different position in the wall.

What do I need to know about funding before replacing?

For BEG funding in Germany, the application must be made before the project starts and an energy efficiency expert must be involved. For the tax bonus under § 35c EStG, execution by a specialist company and a certificate are required.

Can I remove the old front door myself?

In principle yes, but agree this with the fitting firm. It may then accept no responsibility for damage to the reveal and connections, and for funding or the tax bonus the fitting must be done by a specialist firm.

Sources

  1. BAFA – Einzelmaßnahmen an der Gebäudehülle(opens in a new tab)
  2. Finanzverwaltung NRW – Steuerermäßigung für energetische Gebäudesanierung(opens in a new tab)
  3. RAL Gütegemeinschaft Fenster, Fassaden und Haustüren – Gütezeichen(opens in a new tab)
  4. Gebäudemodernisierungsgesetz (GModG), Anlage 7(opens in a new tab)

Ready for your project?

Configure your products to measure and see the price straight away – or send us your questions.

Cover image: Front Door Glass: Privacy, Patterned and Safety
Front doors

Front Door Glass: Privacy, Patterned and Safety

Choosing front door glass: satin finish, patterned, sandblasted designs, triple glazing and safety glass to DIN EN 356, with tips on light and insulation.

7 minutes read

We use strictly necessary cookies so the shop, configurator and basket work. With your consent we also use Google Analytics to measure how the site is used, and marketing signals for advertising. You can change your choice at any time in the footer. Read our privacy policy