A zero threshold makes the way onto the terrace or balcony step-free, but it is the most demanding variant for waterproofing. Because the usual upstand height of 150 mm is dropped, water has to be kept away from the door element by other means: a drainage channel with grating, a fall away from the building, waterproofing taken behind the threshold and a door with a suitable seal. If one of these is missing, moisture damage in the screed is likely. The rules described here are German; readers in the UK or elsewhere should check their local building regulations and the relevant waterproofing standards.

Why 150 mm is the normal case

The technical rule for waterproofing issued by the German roofing trade, the so-called flat-roof guideline (currently the January 2026 edition from ZVDH), governs how waterproofing is connected to walls, windows and doors. The standard is an upstand height of 150 mm above the water-bearing layer or surface. This height ensures that splash water, snow and backed-up water do not reach the threshold.

Accessible transitions need to go below this height. The technical rule permits this but then requires additional measures. Planning principles for threshold height from the accessibility point of view are in the article on the level-access patio door.

The four building blocks of a watertight zero threshold

1. Drainage channel with grating

A channel that collects draining water is installed directly in front of the door element. According to the summary of the technical rule by the manufacturer Richard Brink, the following applies, among other things:

Situation Requirement
Upstand height under 150 mm Channels with gratings, grating nominal width at least 150 mm
Distance of channel and grating from the facade at least 10 mm, at most 20 mm
Accessible transition Gratings in front of door or window element with at least 50% open area
Surface on pedestals Pedestals at least 20 mm high

The channel itself must be drained: to an outlet, into a drainage layer or outwards across the surface.

2. Fall away from the building

Terrace and balcony surfaces need a fall away from the house so that water does not run towards the door. For accessible outdoor seating areas, an external fall of 2 per cent is quoted as usual. The fall lies in the waterproofing layer, not just in the surface.

3. Waterproofing behind and under the threshold

The waterproofing of the terrace or balcony must be connected to the door threshold without gaps. Installation instructions for low thresholds require the threshold to be sealed underneath against pressing water and the threshold connectors to be closed with permanently elastic sealant against water ingress. In addition, the internal connection follows the principle "tighter inside than outside": the room-side layer must be airtight, as section 13 of the German Building Modernisation Act also requires of the building envelope.

4. A door with a suitable seal

  • Lift-and-slide doors: the sash lowers when closed and presses the seals tight. Low thresholds are recessed into the floor; some manufacturers supply sealing cushions under the fixed sash.
  • Hinged doors: magnetic double seals or automatic drop-down seals close the gap to the floor.

Magnetic seal, drop-down seal or low threshold?

Which sealing solution makes sense depends on the type of door and the exposure:

Solution How it works Suitable for
Low threshold of the lift-and-slide door Sash lowers, seals press tight large sliding elements
Magnetic double seal Magnets draw the seal into place on closing tilt-and-turn and hinged doors without a threshold
Automatic drop-down seal Sealing strip moves down on closing sheltered positions, internal doors, covered entrances

The more the door is exposed to wind and driving rain, the more important a canopy or a recess in the facade becomes. A zero threshold on an unprotected west facade is under much greater stress than under a porch roof or a pergola. Check in the manufacturer's documents which driving-rain resistance the element has been tested for, and discuss with the planner whether the location is suitable.

Typical mistakes and how to avoid them

  • Channel without an outlet: a channel that does not drain overflows in heavy rain. Always plan the outlet point.
  • Fall only in the surface: if the waterproofing is level, water collects under the surface in front of the door.
  • Waterproofing stops short of the threshold: water runs under the threshold into the screed.
  • Wrong threshold type: a door with a standard threshold is installed level with the floor, with no sealing function at the bottom.
  • No coordination between trades: window fitter, screeder and waterproofing contractor work one after the other without a detail drawing. The result: gaps at the transition.
  • Condensation overlooked: manufacturers point out that condensation can occasionally occur in the threshold area at extreme temperature differences. Thermally broken thresholds and an insulated substructure reduce the risk.

Maintenance: the channel needs care

A drainage channel only works as long as it is clear. Leaves, sand, pollen and moss lodge in the grating and the channel body. In heavy rain, water then backs up exactly where it does most harm: directly in front of the threshold. So plan for:

  • Regular visual checks, especially in autumn after leaf fall and after storms.
  • Removable gratings, so the channel can be cleaned without tools.
  • An accessible outlet: inspection openings or flushing points make it easier to clear blocked pipes.
  • Cleaning the threshold too: the drainage openings in the door frame and the track of a sliding door must also stay clear.

In winter, frozen water can block the channel. Do not clear snow towards the door but away from it.

Who is responsible?

Several trades meet at a zero threshold: window fitter, screeder, waterproofing contractor or roofer, and landscape gardener for the surface. Without clear responsibility, gaps arise. Before work starts, decide who carries out the interface between door threshold and waterproofing and who supplies the channel. A joint detail drawing with heights provides clarity and helps later in a warranty claim.

New build, renovation and balcony

New build: fix the heights of structural slab, insulation, screed and terrace build-up in a detail drawing before the windows are ordered. That way the threshold height fits exactly.

Renovation: interior floor and exterior surface are often at different levels. A terrace surface on pedestals can be raised; the waterproofing layer stays lower. Check whether there is waterproofing under the old door that can be connected to.

Balcony and roof terrace: there is often living space under the surface. Faults in the waterproofing therefore show immediately. Planning should be done together with a roofer or waterproofing specialist.

A closing note: this article explains the principles. The specific execution on your building is determined by the specialist planner or waterproofing contractor according to the current technical rules.

Checklist before ordering

  • Decide the upstand height: standard 150 mm, or reduced height with additional measures?
  • Clarify channel width, grating open area and outlet
  • Provide a fall in the waterproofing layer
  • Choose a threshold system that suits the door system
  • Draw the connection detail and have all trades confirm it
  • Where you deviate from the technical rule: agree a special solution in writing

If you are planning a patio or balcony door with a low threshold, you will find suitable elements among our lift-and-slide doors and balcony doors. Proper installation of large elements is described in the article installing a lift-and-slide door; general principles for waterproofing window connections are in the article on the three-layer principle.

Frequently asked questions

What is a zero threshold?

A zero threshold is a door transition with no height difference between the interior floor and the exterior surface. Magnetic or drop-down seals then provide the sealing, and water drainage has to be solved with a channel, falls and waterproofing.

What upstand height normally applies at doors?

The German flat-roof guideline assumes a standard upstand height of 150 mm above the surface. Where this is not achieved, as with accessible transitions, additional measures such as channels with gratings are required.

Does every zero threshold need a drainage channel?

With reduced upstand heights, the technical rule requires channels with gratings in front of the element. For accessible transitions, these gratings must have an open area of at least 50 per cent.

Can a zero threshold be retrofitted?

In principle yes; there are systems for new builds and renovation. In refurbishment, however, the existing floor and waterproofing build-up decides whether the transition can be made permanently watertight.

Sources

  1. Richard Brink – Lösungen für fachkonforme Ausführungen nach Flachdachrichtlinie (ZVDH, Januar 2026)(opens in a new tab)
  2. ALUMAT Einbaurichtlinie HST 20 Flachschwelle(opens in a new tab)
  3. ALUMAT – Magnet-Nullschwelle barrierefrei(opens in a new tab)
  4. nullbarriere.de – DIN 18040-2: Freisitz, Terrasse, Balkon(opens in a new tab)
  5. § 13 GModG – Dichtheit(opens in a new tab)

Ready for your project?

Configure your products to measure and see the price straight away – or send us your questions.

Cover image: Level-Access Patio Door: Planning Step-Free Entry
Lift-and-slide doors

Level-Access Patio Door: Planning Step-Free Entry

Planning a level-access patio door: what DIN 18040-2 says on thresholds and clear widths, which door systems suit, and how to keep the transition watertight.

6 minutes read

Cover image: Large Glass Areas: Weight, Structure, Glass Thickness
Lift-and-slide doors

Large Glass Areas: Weight, Structure, Glass Thickness

Large glazed areas in windows and sliding doors: how heavy glass gets, what DIN 18008 regulates, which glass thickness is needed and what the structure checks.

7 minutes read

Cover image: Lift-and-Slide Doors: uPVC or Aluminium?
Lift-and-slide doors

Lift-and-Slide Doors: uPVC or Aluminium?

uPVC or aluminium lift-and-slide doors: sizes, insulation values, looks, upkeep and price compared, with manufacturer data from Schüco, Aluplast and Gealan.

6 minutes read

We use strictly necessary cookies so the shop, configurator and basket work. With your consent we also use Google Analytics to measure how the site is used, and marketing signals for advertising. You can change your choice at any time in the footer. Read our privacy policy