Window Buying Checklist: 20 Questions to Settle Before You Order
8 minutes read
This window buying checklist brings together the 20 questions you should answer before every order, from survey and glass to security, funding, delivery and warranty. Anyone who can answer all the questions clearly avoids the typical costly mistakes: wrong dimensions, missed grants, incomplete quotes and surprises at fitting. The legal and funding points refer to Germany; if you are buying elsewhere, check the rules that apply locally.
It is best to work through the questions in order and note the answers in your window list. For many points you will find more detailed articles.
Window Buying Checklist, Part 1: Planning and Dimensions
1. Which windows are to be replaced or newly fitted? Draw up a list with room, floor and compass direction. That way you keep an overview and can later assign specification precisely, such as burglar protection on the ground floor or solar-control glass facing south. Number each window clearly and use these numbers in quote, order and fitting.
2. Which dimension is ordered, and who takes it? Clarify whether the supplier requires outer frame dimension or masonry opening and how much fitting joint is deducted. When buying online the survey is usually up to you. Instructions are in the article Measuring windows correctly.
3. Which opening type and hand suit the room? Tilt-and-turn, tilt, fixed glazing, meeting-stile? And does the sash hang on the left or the right, seen from inside? Think of furniture, radiators and curtains.
4. How is the parapet connected? Window board connection profile, inside and outside window boards, frame extensions where needed: these details decide whether the finish is clean.
5. Are roller shutters, external venetian blinds or insect screens to be added? When replacing windows, top-mounted roller shutters can be integrated; later, usually only surface-mounted systems. Decide now, not after fitting.
Part 2: Technology and Specification
6. What Uw value is needed? When replacing in existing buildings in Germany, the GEG requires no more than 1.3 W/(m²K) for external windows in residential buildings. For BEG funding no more than 0.95 W/(m²K) applies (as at September 2026). Ask for the value for each individual item, not just for a standard window.
7. Which profile system is being fitted? Manufacturer, system, frame depth and seal system should be in the quote. Only then can quotes be compared.
8. What glass do you need where? Triple glazing with a warm edge as standard; safety glass for floor-to-ceiling elements and on the ground floor; acoustic glass on noisy roads; patterned glass in the bathroom.
9. How much burglar protection makes sense? Mushroom-head bolts, lockable handles, RC2 for easily reached windows. On upper floors simpler specification is often enough.
10. What colour inside and outside? White is cheapest and fastest to deliver. Anthracite outside and white inside is popular but costs a surcharge. Check requirements from the local plan or heritage protection.
Part 3: Costs and Funding
11. Is the quote complete? Windows, removal, disposal, fitting, sealing, reveal, window boards: each service as a separate item. How to compare quotes is shown in the article Comparing window quotes.
12. Do you want to use BAFA funding or the tax bonus? The BEG individual measure offers 15 per cent basic funding and requires an energy efficiency expert; the application must be made before the contract is signed. Alternatively, § 35c EStG gives 20 per cent over three years, spread across the tax returns. You cannot have both for the same measure (as at September 2026).
13. Does the contract contain the necessary funding clause? If you are using BAFA funding, the contract should be concluded under the condition of funding approval.
14. How is the payment plan arranged? Deposit, payment on delivery, final payment after acceptance? For the tax bonus, non-cash payment to the contractor's account is a condition.
Part 4: Contract, Delivery and Fitting
15. Have you checked the order completely? Under § 312g (2) no. 1 BGB, made-to-measure windows are as a rule excluded from the right of withdrawal. The order confirmation is your last chance to correct mistakes. Background in the article Made to measure and the right of withdrawal.
16. How long is the lead time, and when does it start? Have the lead time given with a reference point, such as from order confirmation. Special colours and special glass lengthen it.
17. Who fits, and how? Ask about the fitting method and the sealing inside and outside. For BEG funding and the tax bonus, a specialist company must do the fitting.
18. Is delivery organised? Access, unloading, storage space, helpers. Visible transport damage belongs on the delivery note at once. Large elements such as lift and slide doors may need lifting equipment.
Part 5: After Fitting
19. Are all documents to hand? Invoice, order confirmation, declaration of performance to EN 14351-1, care and maintenance advice and, with funding, the energy efficiency expert's evidence or the specialist contractor's certificate.
20. What warranty and guarantees apply? For windows used for a building which have caused its defectiveness, claims for defects under a sales contract are time-barred under § 438 BGB after five years from delivery; for a contract for work and services on construction work a period of five years from acceptance applies. Voluntary guarantees come on top. Details in the article Warranty and guarantee for windows.
The Three Costliest Mistakes and the Question That Prevents Each
Not every question weighs equally. Three mistakes cause the highest follow-on costs in practice:
- Wrong dimension (questions 2 and 15): a made-to-measure window that does not fit the opening can be neither returned nor altered. In the worst case it is ordered again from scratch. So: have the fitter check the dimension and compare the order confirmation item by item.
- Missed funding (questions 12 and 13): anyone who signs the contract before the BAFA application has been made loses the grant for that measure. On a larger project that can come to a four-figure sum.
- Poor fitting (question 17): a high-quality window with a badly sealed joint causes draughts, heat loss and, in the worst case, moisture damage in the reveal. The fitting method therefore belongs in the quote, not just the word "fitting".
Take particular time over these three points. All the other questions are important but are easier to put right if need be.
The Tick-Off Checklist
| No. | Question | Done |
|---|---|---|
| 1–5 | Window list, dimensions, opening types, connections, sun protection | ☐ |
| 6–10 | Uw value, profile, glass, security, colour | ☐ |
| 11–14 | Quote, funding, funding clause, payment plan | ☐ |
| 15–18 | Order check, lead time, fitting, delivery | ☐ |
| 19–20 | Documents, warranty | ☐ |
Your Next Step
With this list you are well prepared for any consultation and any configurator. Print it out or save it together with your window list so that everyone involved has the same information. Put together your windows item by item in the configurator: there you see dimensions, profile, glass, colour, accessories and the technical values at a glance. If you order regularly as a trade business, it is also worth a look at the B2B portal.
Frequently asked questions
What matters most when buying windows?
Correct dimensions, a Uw value that suits the building, proper fitting and a complete quote with all ancillary services. Mistakes on these points can hardly be corrected afterwards, or only at great cost.
When must I apply for funding for windows?
For BAFA's BEG funding in Germany, before the supply or service contract is concluded. A contract with a suspensive or resolutive condition of funding approval is possible (as at September 2026).
What Uw value do new windows need?
When replacing in existing buildings in Germany, the GEG requires no more than 1.3 W/(m²K) for external windows in residential buildings. For BEG funding no more than 0.95 W/(m²K) applies. In a new build the necessary value follows from the energy demand calculation.
Can I cancel an order for made-to-measure windows?
As a rule not by withdrawal, because made-to-measure goods are excluded from the right of withdrawal under § 312g (2) no. 1 BGB (German law). Check all details before you submit.
Sources
- GEG Anlage 7 – Höchstwerte der Wärmedurchgangskoeffizienten(opens in a new tab)
- Sofort-Förderung: Förderung für neue Fenster 2026 (BEG-Voraussetzungen)(opens in a new tab)
- BAFA: Förderung Gebäudehülle(opens in a new tab)
- § 312g BGB – Widerrufsrecht(opens in a new tab)
- § 438 BGB – Verjährung der Mängelansprüche(opens in a new tab)
- Regierungspräsidium Tübingen: Fenster und Außentüren als harmonisierte Bauprodukte(opens in a new tab)
- Finanzamt NRW: Steuerermäßigung § 35c EStG(opens in a new tab)
Ready for your project?
Configure your products to measure and see the price straight away – or send us your questions.