GEG requirements when replacing windows in Germany: what applies since the Building Modernisation Act
7 minutes read
When replacing windows in Germany, the energy requirements that many still know as the GEG requirements apply; since 29 July 2026 they have been in the Building Modernisation Act (Gebäudemodernisierungsgesetz, GModG). For residential buildings this means: new windows and door-windows may not exceed a Uw value of 1.3 W/(m²K), roof windows 1.4 W/(m²K), and sliding and lift-and-slide doors 1.6 W/(m²K) (status: September 2026). The obligation applies if more than 10 per cent of the building's window area is renewed, and the window fabricator confirms compliance in writing. This article is about German law; readers in the UK or other countries should check the requirements of their own building authority (in England, for example, Approved Document L).
From GEG to GModG
The Bundestag and Bundesrat passed the amendment to the Building Energy Act in July 2026; since 29 July 2026 it has been called the Building Modernisation Act. The big political changes concern mainly heating. For windows, according to the consumer advice centre, many rules have been carried over: the familiar maximum values of Annex 7 continue to apply, only the section numbers have changed. The requirements for existing buildings are now in section 36 GModG, the contractor's declaration in section 96 GModG.
This article explains the rules for owners and tradespeople. It does not replace legal advice; in an individual case, the authority responsible under state law decides.
When the requirements apply
Under section 36 (1) GModG: if external components within the meaning of Annex 7 are renewed, replaced or installed for the first time in heated or cooled rooms, the affected areas may not exceed the maximum values of Annex 7.
Three conditions follow:
- Heated or cooled room: a window in an unheated garage is not covered.
- A measure under Annex 7: for example replacing complete windows, installing additional secondary or internal windows, or replacing the glazing.
- More than 10 per cent: under section 36 (2), changes are exempt if they affect no more than 10 per cent of the total area of the relevant component group of the building.
The Annex 7 maximum values for windows
| Measure | Residential buildings | Characteristic value |
|---|---|---|
| Replacement or first installation of windows and door-windows | 1.3 W/(m²K) | Uw |
| Installation of additional secondary or internal windows | 1.3 W/(m²K) | Uw |
| Roof windows | 1.4 W/(m²K) | Uw |
| Door-windows with a folding, sliding or lifting mechanism | 1.6 W/(m²K) | Uw |
| Glass roofs | 2.0 W/(m²K) | Uw |
| Replacing only the glazing or glazed sash frames | 1.1 W/(m²K) | Ug |
| External doors | 1.8 W/(m²K) | U (door area) |
Status: September 2026. For non-residential buildings with low interior temperatures (12 to 19 °C), higher values partly apply.
Special cases
- Special glazing for sound or fire protection and bullet-resistant glass: higher values are permitted, 2.0 W/(m²K) for windows and Ug 1.6 W/(m²K) for glass replacement alone.
- Box and compound windows: when replacing the glazing, the requirement counts as met if a pane with an infrared-reflecting coating with an emissivity of at most 0.2 is installed.
What the characteristic values mean is explained in the article Uw, Ug, Uf explained.
The 10 per cent rule in practice
The de minimis threshold relates to the total area of the relevant component group, for windows the entire window area of the building. If you replace just a single bathroom window in a detached house, that is often below 10 per cent. If all the windows on one facade or the large patio door are renewed, the threshold is quickly exceeded.
In practice the threshold rarely matters: new windows with double or triple thermal insulation glazing generally achieve the Annex 7 values anyway. It is more relevant for repairs and for glass replacement in old frames.
Alternative: proof for the whole building
Instead of meeting the individual values, section 38 GModG allows proof for the entire building. For residential buildings, the annual primary energy demand may then exceed that of a reference building by no more than 40 per cent, and the specific transmission heat loss may not exceed certain limits. This route is interesting for comprehensive renovations.
If it is chosen by owners of a residential building with no more than two dwellings, section 36 (3) requires an informational advice session with a person authorised to issue energy performance certificates before planning is commissioned, provided such a session is offered free of charge. A firm offering such work must, under paragraph 4, point out this obligation in writing in its quotation.
Exemption in individual cases
The authority responsible under state law can grant an exemption on application, in particular where the measure is not economical in the individual case. Under the coupling principle, only the additional energy-related costs count. An exemption is the exception and must be applied for before execution.
Proof: the contractor's declaration
Under section 96 GModG, anyone who commercially changes or installs external components within the meaning of section 36 must confirm in writing to the owner that the components meet the requirements. For you as the owner, that means:
- Request the contractor's declaration: it is part of the window fabricator's service.
- Keep it for at least ten years.
- Present it on request: the authority responsible under state law can ask for the declaration.
If you install windows yourself, you receive no contractor's declaration; the obligation to meet the values still applies. More on the limits of DIY installation in the article installing windows yourself.
Statutory minimum and funding
The Annex 7 values are a minimum standard. For BAFA funding of individual measures, a Uw of no more than 0.95 W/(m²K) generally applies to windows and balcony and patio doors, which is considerably stricter (status: September 2026). If you want funding, you must submit the application before awarding the contract and involve an energy efficiency expert. Details in the article BAFA funding for windows 2026.
| Goal | Uw value of windows (residential) |
|---|---|
| Statutory minimum (Annex 7 GModG) | ≤ 1.3 W/(m²K) |
| BAFA individual measure | ≤ 0.95 W/(m²K) |
Further obligations on installation
Besides the U-value, the principle of airtightness also applies when replacing windows: under section 13 GModG, the heat-transferring envelope, including the joints, must be permanently sealed against air leakage. Professional installation with a joint that is airtight inside and driving-rain-tight outside prevents heat loss and moisture damage. You should also plan ventilation anew after replacing with airtight windows; see ventilation concept when replacing windows.
Typical questions from practice
- Repair instead of replacement: if only seals or hardware are renewed, this is not a measure under Annex 7.
- New window in a new opening: first-time installation also falls under section 36.
- Heritage protection: exemptions are possible for listed buildings; consult the heritage authority.
Checklist for owners
- Check whether more than 10 per cent of the window area is affected
- Compare the Uw value of each element with Annex 7
- For funding: note the stricter value and the application before the contract is awarded
- Commission airtight installation
- Obtain the contractor's declaration and keep it for ten years
All windows and doors in our range can be configured with glazing that meets the Annex 7 requirements; you reach values that qualify for funding with triple glazing. Put your windows together in the configurator and have the Uw value stated in the quotation.
Frequently asked questions
Does the GEG still apply to window replacement?
The Building Energy Act (GEG) was amended in 2026 and has been called the Building Modernisation Act (GModG) since 29 July 2026. The requirements for windows when replacing are now in section 36 and Annex 7 GModG; the familiar maximum values continue to apply (status: September 2026).
What U-value must a new window have when replacing?
In residential buildings, a maximum of Uw 1.3 W/(m²K) for windows and door-windows, 1.4 W/(m²K) for roof windows and 1.6 W/(m²K) for door-windows with a folding, sliding or lifting mechanism (status: September 2026).
Do I have to meet the requirements when replacing a single window?
Not necessarily. Changes affecting no more than 10 per cent of the total area of the relevant component group of the building are exempt. In practice, new windows almost always meet the values anyway.
Which documents do I get from the window fabricator?
Under section 96 GModG, the contractor must confirm in writing that the installed components meet the requirements (contractor's declaration). Owners must keep it for at least ten years and present it to the authority on request.
Sources
- § 36 GModG – Anforderungen an ein bestehendes Gebäude bei Änderung(opens in a new tab)
- Anlage 7 GModG – Höchstwerte der Wärmedurchgangskoeffizienten(opens in a new tab)
- § 96 GModG – Private Nachweise (Unternehmererklärung)(opens in a new tab)
- § 38 GModG – Energetische Bewertung eines bestehenden Gebäudes(opens in a new tab)
- GModG-Infoportal: Fenster und andere transparente Bauteile(opens in a new tab)
- GModG-Infoportal: Bedingte Anforderungen (Befreiung, Kopplungsprinzip)(opens in a new tab)
- Verbraucherzentrale – GModG: Was steht im Gebäudemodernisierungsgesetz?(opens in a new tab)
- heizung.de – GModG beschlossen: Inkrafttreten 29. Juli 2026(opens in a new tab)