Replacing Windows in Winter: What Is Possible in the Cold and What to Watch For
6 minutes read
Replacing windows in winter works well if two conditions are met: the fitting materials must be suitable for low temperatures, and each window opening may only be open briefly. Specialist firms therefore work room by room and use winter foams and suitable sealing tapes in the cold. In continuous frost, snowfall or heavy rain, on the other hand, it makes sense to postpone the appointment.
Many owners put off the replacement until spring, even though the windows are most annoying in winter. This article shows what to watch technically in the cold and how to prepare the day well. The funding reference below applies to Germany; if your property is elsewhere, please check local grants and rules.
Replacing windows in winter: what counts technically
Fitting foam and temperature
PU fitting foam cures with air moisture. In the cold, this reaction is slower, and the foam can adhere less well and expand less. The manufacturer Soudal describes PU foam as generally workable at ambient temperatures between 5 and 25 degrees; below that, processing becomes harder, curing slower and adhesion poorer.
For the cold season there are therefore winter foams. illbruck states for its products FM210 and FM230 that they are tested by the MPA as winter foams for use from 0 °C. What matters is not only the air temperature but also the can and substrate temperature: cold cans are warmed before use, and the reveal must not be iced up or wet.
Sealing tapes and membranes
Connection tapes and adhesive membranes also have minimum application temperatures, which the manufacturer gives in the technical data sheet. Adhesive surfaces must be clean, dry and free of frost. Pre-compressed sealing tapes expand more slowly in the cold, and the fitter has to allow for that in the joint design.
Plaster and making-good
Mineral plasters and mortars tolerate frost badly while setting. External work at the reveal is therefore often postponed to milder days in frost, while the windows themselves are already fitted and connected airtight on the inside. Clarify with the firm when the external connection work will be done and how the joint is protected from driving rain until then.
Glass and frame
uPVC profiles become somewhat stiffer in the cold and contract. That is no problem during installation if the joint widths are planned according to the installation guidelines. Large elements such as lift-slide doors demand particular care in the frost when transporting and packing the glass.
How a winter window replacement runs
- Check the weather: The firm decides the day before, based on the forecast, whether the appointment goes ahead.
- Prepare the room: Move furniture, take down curtains, leave the heating on, close doors to other rooms.
- Remove the old window: Lift out the sashes, release the frame, clean the reveal. More in the article Removing and disposing of old windows.
- Set and fix the new window: align, pack, fix.
- Close the joint: airtight inside, insulating in the middle, driving-rain-tight outside, with winter-suitable materials.
- Close up the room: hang the sashes, adjust, check function.
With an experienced team, each window opening is usually open for only a short time. When all the windows in a house are removed, work proceeds room by room so that the house is never completely open.
Advantages of a winter appointment
- Immediate effect: Draughts and cold panes disappear in the heating season, when they bother you most.
- Quality control in the cold: Leaks at the connection or at the seals are more noticeable with temperature differences. A blower door measurement is particularly informative in winter; see Blower door test and the window connection.
- Planning for funding: If you plan the replacement with funding, the application must be made before the project starts. Use the winter months for energy consultation, application and measuring so that installation can take place at the right time. Details in the article KfW or BAFA for windows?.
Disadvantages and risks
- Weather dependence: Frost, snow and storms can postpone appointments.
- External work: Plastering and façade work may have to be caught up later.
- Construction moisture: After the replacement, the rooms are more airtight. In the first weeks, moisture from plaster and making-good can add to the load on the room air.
After installation: do not forget to ventilate
New windows are airtight. To avoid moisture problems, the German Federal Environment Agency recommends, in winter, short bursts of wide-open ventilation two to three times a day for about five minutes per room, and a relative humidity between 40 and 60 per cent. In the first winter after the replacement especially, you should check with a hygrometer whether that is working. If the panes mist up on the inside, read the article Condensation on windows; for ventilation planning, the article Ventilation concept under DIN 1946-6.
When it is better to wait
| Situation | Recommendation |
|---|---|
| Continuous frost well below 0 °C | postpone, unless materials approved for these conditions are used |
| Heavy rain or snowfall | postpone, wet reveals prevent safe sealing |
| Façade insulation planned for spring | plan windows at the same time as the façade, agree the position in the insulation plane |
| Rooms with vulnerable people, e.g. babies | arrange an alternative room or replace in a milder spell |
Large elements and new builds in winter
In a new build, fitting windows in winter is often even welcome so that the building is closed and interior finishing can begin. A shell, however, contains a lot of construction moisture from screed, plaster and masonry. As soon as the windows are in, this moisture has to be removed in a controlled way, by regular purge ventilation, if necessary supported by building dryers. Otherwise water condenses on the new panes and reveals.
With large elements such as lift-slide doors or panoramic glazing, transport and bringing them in are more demanding in snow and ice. Paths and access routes must be cleared and non-slip, and heavy glass elements must not be set down on frozen ground. You will find advice on delivering large elements in the article Transport and delivery of large glass elements.
What to look for in the quote
Ask the specialist firm explicitly:
- Which foams, tapes and membranes are used and from what temperature they are approved.
- How long each opening is expected to stay open.
- How the joint is protected if external plastering work is postponed.
- Whether installation follows the guide to planning and carrying out the installation of windows and front doors. The basics are explained in the article RAL installation.
Checklist for a winter replacement
- Complete the funding application and measuring in good time.
- Agree weather windows with the firm and arrange a fallback date.
- Ask about material approvals for low temperatures.
- Prepare the rooms and leave the heating on.
- After installation, check function and carry out the handover; see Acceptance and handover.
- In the first weeks, check humidity and ventilate consistently.
Start planning your new windows now: in the window configurator you put together dimensions, profile and glazing, and for trade firms with several winter sites, our B2B portal offers tiered terms.
Frequently asked questions
Can windows be replaced in winter?
Yes, if the fitting materials are suitable for low temperatures and the rooms are only open briefly. Specialist firms replace windows room by room, so each opening is usually open for only a few hours. In hard frost, snow or continuous rain, the appointment is often postponed.
Which fitting foam works in the cold?
Special winter foams. illbruck states for its foams FM210 and FM230 that they are tested by the MPA as winter foams for use from 0 °C. According to manufacturers, normal PU foams are best applied between about 5 and 25 °C.
Will it get cold in the home during installation?
Briefly, in the room affected. The heating should stay on, and doors to other rooms are closed. After installation the room warms up quickly again.
Is replacing windows in winter cheaper?
That cannot be said across the board. Scheduling and prices depend on the firm and the region. One advantage is that you notice the draughts and cold panes of the old windows particularly clearly in winter and feel the effect straight away.
Sources
- illbruck: Montageschäume (Winterschäume FM210 und FM230)(opens in a new tab)
- Soudal: PU-Schäume und Verarbeitungstemperaturen(opens in a new tab)
- ift Rosenheim: Leitfaden zur Montage von Fenstern und Haustüren (7. Ausgabe)(opens in a new tab)
- Umweltbundesamt: Richtig lüften, Schimmelbildung vermeiden(opens in a new tab)
- BAFA – Gebäudehülle (BEG EM)(opens in a new tab)